Red Eléctrica del Norte
In Chile, Redinter owns 69.9% of the share capital of Red Eléctrica del Norte S.A. (REDENOR), while Cobra Instalaciones y Servicios owns 30.1%.
In May 2016, REDENOR was awarded a project for constructing, operating, and maintaining a 278-kilometres, 220 kV transmission line, as well as constructing a Nueva Pozo Almonte substation and three line inlets. This project marks the beginning of a business plan for the Expansion of the Backbone Transmission Systems for Execution and Operation through the exempt decree No. 373, with the Chilean Ministry of Energy.
The project, known under the contract name "Conditions of execution and operation of the new construction work belonging to the National Transmission System," consists of two stages. Stage 1 involves the NPA 220 kV Disconnector Substation, which is currently in commercial operation, and Stage 2 includes laying out the first circuit of the New 2x220 kV Line between Nueva Pozo Almonte SS – Pozo Almonte, laying out the first circuit of the New Line 2x220 kV between Nueva Pozo Almonte SS - Cóndores, and laying out the first circuit of the New Line 2x220 kV between Nueva Pozo Almonte SS – Parinacota (currently in the commissioning phase since 30 September 2022, awaiting the letter of Start Up of Operations by the Coordinator). They are located in the rural area of the Pozo Almonte municipality, Tamarugal Province, in the Tarapacá Region.
Spatial location provided for reference (UTM 19S – WGS84 coordinates))
East: 421982.70 North: 7753599.70
- The project borders approximately 1.2 km to the south with Route A-665 (Route 5 Junction Sara - La Tirana - La Huayca - Matilla - Pica).
- It borders 1.3 km to the west with Route 5 (Longitudinal Norte, Sector: Quillagua – Cuya).
- It borders 4.7km to the north with Route A-615 (Route 5 Junction – Bypass Pozo Almonte – Junction A-65).
- It borders 7.5 km to the north with Sector Poblado de Pozo Almonte.
- It borders 4.07 km to the north with Sector Poblado de Pozo Almonte. Of. San Andrés.
- It borders 1.9 km to the south west with Sector Poblado de Pozo Almonte. Of. Sara.
- It borders 2.15 km to the south east with housing infrastructures, Sector de Pozo Almonte.
- It borders 9.82 km to the south east with Sector La Tirana.
Description of the project
Client name: | Ministerio de Energía - Gobierno de Chile |
Contract name: | Conditions of execution and operation of the new construction work belonging to the National Transmission System:
|
Contract code: | Decretos N° 373, Resoluciones, Solicitudes y Normas De Interés Particular. |
Project execution period: | 48 months |
Start date: | 05 February 2022. |
Completion date: | 05 March 2022. |
Location of the Works: | Región de Arica and Parinacota |
The work involves the following components: |
|